PistonHead Track Construction

Build Up Pictures

10
Here's how the finished tongue and groove looked before assembly to
the end of each section of track. We pre-drilled the holes at this stage so
everything would line-up. Each section was numbered so when assembled 
they would match perfectly.
11
Here I am cutting the leg braces from the waste section of each straight
away. This is the only task that they trusted me with, except getting the
refreshments.
12
This shows one end of the tongue and groove section. I had
to notch out the section where the braid would go down 
through the track. This might me easier to do "before"
assembly
13
This is side two of the tongue and groove section. I had to
notch this section later as well. The sections fit very tight, with 
the braid installed, it would not let the section join properly.
14
Finally got the track home after a couple of weekends of work.
I test fitted each section to make sure everything was going to 
work. This is prior to making the bank end of the track.
15
16
17
18
pistonhe@pistonheadraceway.com
HOME - LINKS - LEAGUE - MY TRACK - MY CARS - OLDCAR PICS - CONTACT US